casibom casibom casibom holiganbet Casibom casibom casibom casibom casibom casibom giriş casibom casibom giriş casibom giriş casibom casibom casibom casibom giriş casibom PORNOOOOO ANAMI SİKİN BEN ANAMI SİKTİRİYORUM CASİB ANAMI SİKT,İLER EYVAHHH DOLANDIRICIYIZ BİZ PARA İÇİN ANAMI SATIYORUM LİNK PORNO YETER AM ACIDI PORNOSU casibom casibom casibom casibom casibom casibom giriş casibom Casibom giriş casibom casibom casibom PİSHİNG ANASINI SİKTİRENLER PİSHİNG ANASINI SİKTİRENLER PİSHİNG ANASINI SİKTİRENLER PİSHİNG ANASINI SİKTİRENLER PİSHİNG ANASINI SİKTİRENLER PİSHİNG ANASINI SİKTİRENLER PİSHİNG ANASINI SİKTİRENLER casibom giriş https://www.zawadzky.edu.co/ casibom Casibom796 HD KALİTEDE PORNO FİLM İZLE HD KALİTEDE PORNO FİLM İZLE HD KALİTEDE PORNO FİLM İZLE HD KALİTEDE PORNO FİLM İZLE HD KALİTEDE PORNO FİLM İZLE casibom casibom casibom Meritking Meritking casibom casibom casibom ultrabet Casibom HD PORNO HD PORNO PORNO HD HD PORN casibom güncel giriş casibom extrabet Casibom resmi giriş https://carisca.knust.edu.gh/casibom/ https://carisca.knust.edu.gh/meritking/ https://carisca.knust.edu.gh/ultrabet/ https://carisca.knust.edu.gh/sahabet/ https://carisca.knust.edu.gh/romabet/ https://carisca.knust.edu.gh/pusulabet/ https://carisca.knust.edu.gh/perabet/ https://carisca.knust.edu.gh/padisahbet/ https://carisca.knust.edu.gh/oslobet/ https://carisca.knust.edu.gh/onwin/ https://carisca.knust.edu.gh/mobilbahis/ https://carisca.knust.edu.gh/milanobet/ https://carisca.knust.edu.gh/matadorbet/ https://carisca.knust.edu.gh/jojobet/ https://carisca.knust.edu.gh/holiganbet/ https://carisca.knust.edu.gh/hitbet/ https://carisca.knust.edu.gh/extrabet/ https://carisca.knust.edu.gh/betvole/ https://carisca.knust.edu.gh/betturkey/ https://carisca.knust.edu.gh/betebet/ https://carisca.knust.edu.gh/bets10/ extrabet casibom casibom https://carisca.knust.edu.gh/marsbahis/ https://bongopix.com/ultrabet/ casibom casibom casibom casibom https://community.onlinedigihub.com/d/2-casibom-giris-hesabiniza-adim-adim-erisim https://community.onlinedigihub.com/d/3-casiboma-hizli-ve-kolay-giris-yapin https://community.onlinedigihub.com/d/4-casibom-giris-rehberi-hizli-ve-guvenli-erisim https://community.onlinedigihub.com/d/24-betnef-giris-adresi-2025 https://community.onlinedigihub.com/d/25-casibom-casibom-giris-casibom-guncel-giris casibom https://community.onlinedigihub.com/d/35-extrabet-extrabet-giris-extrabet-guncel-giris https://community.onlinedigihub.com/d/38-casibom-2025-casibom-en-iyi-slot-casino-sitesi-giris https://community.onlinedigihub.com/d/39-casibom-pazar-giris https://cassiresmi.tumblr.com/ casibom casibom giriş https://carisca.knust.edu.gh/bahislion/ https://carisca.knust.edu.gh/betmatik/ https://carisca.knust.edu.gh/bahsegel/ https://carisca.knust.edu.gh/deneme-bonusu-veren-siteler/ https://community.onlinedigihub.com/d/41-casibom-pazartesi-giris https://community.onlinedigihub.com/d/49-casibom-sali-gunu-giris casibom casibom https://bongopix.com/casibom-giris/ casibom https://github.com/extrabetguncvell/extrabetgirisii/issues/1 https://doctordeshpande.com/casibom-casibom-guncel-giris-adresi-2025/ https://doctordeshpande.com/jojobet-jojobet-giris-adresi-2025/ https://casibomgirisi.onlinedigihub.com/ https://giris-2024.onlinedigihub.com/ https://casibom-giris-org.onlinedigihub.com/ https://bomcak.onlinedigihub.com/ https://casibom-giris-org.onlinedigihub.com/ https://casgnydn.onlinedigihub.com/ https://casiisgeceburda.onlinedigihub.com/ https://gvnligiris.onlinedigihub.com/ https://casibom-giris-resmi.onlinedigihub.com/ https://casibom-giris-resmi.onlinedigihub.com/ https://casibomguncel.onlinedigihub.com/ https://casibomguncelgiris.onlinedigihub.com/ https://casibomgirisguncelpersembe.onlinedigihub.com/ https://casibomgunceltek.onlinedigihub.com/ https://casibo-tkla-tek-gncel-giris.onlinedigihub.com/ https://casibom-telegram.onlinedigihub.com/ Casibom Padişahbet casibom casibom https://bsc.ly/ PİŞSHİNG O .Ç
  Finally found you – complete machining technical requirements – OLICNC ONLINE STORE
  • +86-135-0547-0902
  • olima@olimachine.com
  • Shandong,China
0 $0.00

购物车里没有产品

Finally found you – complete machining technical requirements

General technical requirements

 

1. The parts are descaled.

2. On the machined surface of the parts, there should be no defects such as scratches, scratches, etc. that damage the surface of the parts.

3. Remove burrs.

 

Heat Treatment Requirements

1. After quenching and tempering, HRC50~55.

2. The parts are subjected to high frequency quenching, tempering at 350~370℃, HRC40~45.

3. Carburizing depth 0.3mm.

4. Carry out high temperature aging treatment.
Tolerance requirements

1. The unmarked shape tolerance shall meet the requirements of GB1184-80.

2. The allowable deviation of the unmarked length dimension is ±0.5mm.

3. The tolerance zone of the casting is symmetrical to the basic dimension configuration of the blank casting.

 

Part corners

1. The fillet radius R5 is not specified.

2. The unmarked chamfer is 2×45°.

3. Sharp corners/sharp corners/sharp edges are blunt.

 

Assembly requirements

1. Each seal must be saturated with oil before assembly.

2. The assembled rolling bearing is allowed to use oil heating for hot charging, and the temperature of the oil should not exceed 100 ℃.

3. After the gear is assembled, the contact spots and backlash of the tooth surface should meet the requirements of GB10095 and GB11365.

4. Sealing packing or sealant is allowed when assembling the hydraulic system, but should be prevented from entering the system.

5. Parts and components (including outsourced parts and outsourced parts) that enter the assembly must have the qualification certificate of the inspection department before they can be assembled.

6. The parts must be cleaned and cleaned before assembly, and there should be no burrs, flashes, scales, rust, chips, oil, colorants and dust.

7. Before assembly, the main fit dimensions of parts and components, especially the interference fit dimensions and related accuracy, should be reviewed.

8. The parts are not allowed to be knocked, bumped, scratched and corroded during the assembly process.

9. When tightening screws, bolts and nuts, it is strictly forbidden to strike or use unsuitable bits and wrenches. 10. Fasteners with the specified tightening torque must be tightened with a torque wrench and tightened according to the specified tightening torque.

11. When the same part is fastened with multiple screws (bolts), each screw (bolt) should be crossed, symmetrically, gradually and evenly tightened.

12. When assembling, the taper pin and the hole should be painted and inspected, and the contact rate should not be less than 60% of the matching length, and should be evenly distributed.

13. The flat key and the two sides of the keyway on the shaft should be in even contact, and there should be no gap between the mating surfaces.

14. The number of tooth surfaces in contact with the spline assembly at the same time shall not be less than 2/3, and the contact ratio shall not be less than 50% in the direction of the length and height of the spline teeth.

15. After the flat key (or spline) of the sliding fit is assembled, the fittings can move freely without uneven tightness.

16. After bonding, remove excess adhesive that has flowed out.

17. The outer ring of the bearing, the semi-circular hole of the open bearing seat and the bearing cover must not be stuck.

18. The outer ring of the bearing should be in good contact with the semi-circular hole of the open bearing seat and the bearing cover. When checking with coloring, it should be 120° symmetrical to the center line with the bearing seat and 90° symmetrical to the center line with the bearing cover. even contact. When checking with a feeler gauge within the above range, the 0.03mm feeler gauge shall not be inserted into 1/3 of the outer ring width.

19. After the bearing outer ring is assembled, it should be in even contact with the end face of the bearing cap at the positioning end.

20. After the rolling bearing is installed, it should be flexible and stable to rotate by hand.

21. The joint surfaces of the upper and lower bearing shells should be closely attached and cannot be checked with a 0.05mm feeler gauge.

22. When fixing the bearing bush with the locating pin, drill the hinge and match the pin under the condition that the mouth face and end face of the bush are flush with the opening face and end face of the relevant bearing hole. The pins must not be loosened after being driven in.

23. The bearing body and the bearing seat of the spherical bearing should be in uniform contact, and the contact should not be less than 70%.

24. When the surface of the alloy bearing lining is yellow, it is not allowed to use, and there is no nucleation phenomenon within the specified contact angle. The nucleation area outside the contact angle shall not be greater than 10% of the total area of ​​the non-contact area.

25. The datum end face of the gear (worm gear) and the shaft shoulder (or the end face of the positioning sleeve) should fit together, and check with a 0.05mm feeler gauge. And the verticality requirements of the gear reference end face and the axis should be guaranteed.

26. The joint surface of the gear box and the cover should be in good contact.

27. Strictly check and remove the sharp corners, burrs and foreign objects left in the processing of the parts before assembly. Make sure that the seals are not scratched when they are installed.

 

Casting Requirements

1. Cold space, cracks, shrinkage cavities, penetrating defects and serious incomplete defects (such as undercasting, mechanical damage, etc.) are not allowed on the casting surface.

2. The castings should be cleaned without burrs and flashes. The pouring risers on the non-processing surface should be cleaned and flush with the surface of the castings.

3. The cast characters and signs on the non-machined surface of the castings should be clearly identifiable, and the positions and fonts should meet the requirements of the drawings.

4. The roughness of the non-machined surface of the casting, sand casting R, is not more than 50μm.

5. Castings should be clear of pouring risers, flying spurs, etc. The residual amount of the pouring riser on the non-machined surface should be leveled and polished to meet the surface quality requirements.

6. The molding sand, core sand and core bone on the casting should be cleaned.

7. If the casting has inclined parts, its dimensional tolerance zone should be symmetrically arranged along the inclined plane.

8. The molding sand, core sand, core bone, succulent, sticky sand, etc. on the casting should be smoothed and cleaned.

9. Correction of wrong type and cast deviation of boss should be made to achieve smooth transition and ensure the appearance quality.

10. For the wrinkle on the non-machined surface of the casting, the depth should be less than 2mm, and the spacing should be greater than 100mm.

11. The non-machined surfaces of machine product castings need shot peening or roller treatment to meet the requirements of cleanliness Sa2 1/2.

12. Castings must be water toughened.

13. The surface of the casting should be flat, and the gate, burr, sticky sand, etc. should be cleaned.

14. Castings are not allowed to have casting defects such as cold partitions, cracks and holes that are detrimental to the use.

 

Painting requirements

1. The surfaces of all steel parts that need to be painted must be removed from rust, scale, grease, dust, mud, salt and dirt before painting.

2. Before rust removal, use organic solvent, lye, emulsifier, steam, etc. to remove grease and dirt on the surface of steel parts.

3. The time interval between the surface to be coated by shot peening or manual rust removal and the primer coating shall not be more than 6h.

4. The surfaces of the riveted parts in contact with each other must be coated with anti-rust paint with a thickness of 30-40 μm before connecting. Lap edges should be closed with paint, putty or adhesive. Primer damaged due to processing or welding, to be repainted.

Piping Requirements

1. All pipes should be free of burrs, burrs and chamfers before assembly. Use compressed air or other methods to remove debris and rust attached to the inner wall of the pipe.

2. Before assembly, all steel pipes (including prefabricated pipes) should be degreasing, pickling, neutralizing, water washing and anti-rust treatment.

3. When assembling, tighten the pipe clamps, supports, flanges and joints that are fixed with threaded connections to prevent loosening.

4. The welded part of the prefabricated pipe shall be subjected to a pressure test.

5. When piping is replaced or transported, the separation port of the piping must be sealed with tape or plastic pipe to prevent any debris from entering, and a label must be attached.

 

Repair welding requirements

1. The defects must be completely removed before welding, the groove surface should be smooth and smooth, and there should be no sharp corners.

2. According to the defects of steel castings, the defects in the welding area can be removed by shovel excavation, grinding, carbon arc gouging, gas cutting or mechanical processing.

3. Dirt such as sticky sand, oil, water, rust and other dirt within 20mm around the welding area and the groove must be thoroughly cleaned.

4. During the whole welding process, the temperature of the preheating zone of the steel casting shall not be lower than 350°C.

5. Welding should be performed in a horizontal position as far as possible.

6. During repair welding, the electrode should not swing too much laterally.

7. When surfacing welding on the surface of steel castings, the overlap between the weld bead shall not be less than 1/3 of the width of the weld bead. The welding meat is full, and the welding surface is free of burns, cracks and obvious nodules. The appearance of the welding seam is beautiful, and there are no defects such as bite, slag, pores, cracks, and splashes; the welding wave is uniform.

 

Forging requirements

1. The nozzles and risers of the ingots should have enough cut-off to ensure that the forgings have no shrinkage holes and serious deflections.

2. Forgings should be forged on a forging press with sufficient capacity to ensure that the interior of the forgings is fully forged.

3. Forgings are not allowed to have visible cracks, folds and other appearance defects that affect the use. Local defects can be removed, but the cleaning depth should not exceed 75% of the machining allowance. Defects on the non-machined surface of the forging should be cleaned up and smoothly transitioned.

4. Forgings are not allowed to have white spots, internal cracks and residual shrinkage cavities.

 

Machined parts requirements

1. Parts should be inspected and accepted according to the process. After the previous process has passed the inspection, it can be transferred to the next process.

2. The processed parts are not allowed to have burrs.

3. The finished parts should not be placed directly on the ground, and necessary support and protection measures should be taken. The machined surface is not allowed to have rust, bumps, scratches and other defects that affect performance, life or appearance.

4. There should be no peeling on the surface of rolling finishing.

5. There should be no oxide scale on the surface of the parts after heat treatment in the final process. Finished mating surfaces and tooth surfaces should not be annealed

6. The surface of the processed thread is not allowed to have defects such as black skin, bumps, random buckles and burrs.